For over ten years, we have helped companies manage industrial machinery moving safely, carefully and with minimal disruption. At Machinery Movers, we handle CNC machine moving, heavy machinery transport, and the relocation of technologies, production equipment and entire production units across the Czech Republic and abroad. Every move is planned individually with regard to the type of equipment, the available space, access conditions and the operational requirements of the site. We provide handling, loading, transport, unloading and positioning at the new location so the whole project is completed safely and with as little downtime as possible.
No machinery move is ever the same. Before anything is moved, we come to inspect the machine itself, the access routes, the surrounding space and the parts of the operation that must remain running. A CNC machine has different requirements from a press shop, and moving a single machine is not comparable to relocating an entire production line. Weight, dimensions, route limitations and the level of downtime the client can afford all play a role. That is why we do not work from a template. We propose the solution only after an on-site assessment, so it makes sense technically, safely and in terms of timing.
Jan Holub, Managing Directors
Reference projects
How Machine Relocation Works
First, we need to know what we’re dealing with—the type of machine, its dimensions, weight, and the pickup and delivery locations. Based on this information, we’ll propose a handling method, the necessary equipment, and a timeline. Then comes the preparation: disassembly, securing, routing through the hall or outside, loading, and transport. As needed, we coordinate a crane, forklift, or other equipment. On site, we position and set up the machine and hand it over ready for further work. We manage the entire process so that production downtime is kept to a minimum.
What We Move Most Often
- CNC machining centers, lathes, milling machines, injection molding machines
- Presses, furnaces, process equipment
- Handling and transport of heavy machinery (including oversized items)
- Machine relocations within the hall (layout changes)
- Turnkey relocation of production lines and workstations
- Dismantling, loading, transport, installation, and alignment
- Route planning, coordination of cranes/forklifts, safety
Send us the machine specifications (type, dimensions/weight, origin–destination, deadline), and we’ll provide a proposal and quote within 24 hours.
Machinery relocation with Machinery Movers. Anytime, anywhere.
The price and process always depend on the specific project. The more details you provide us with at the outset, the faster we can provide you with a concrete proposal. We will prepare a non-binding quote within 24 hours and propose the safest approach (including dismantling, installation, and insurance) for both the Czech Republic and international projects.

What Our Customers Say
“We worked with Machinery Movers to move CNC machines from France to the Czech Republic in August–September 2024 and March 2025. This involved a total of 8 CNC machines and 2 storage racks. I greatly appreciate their professionalism, problem-solving skills, and flexibility. I recommend Machinery Movers and look forward to further collaboration.” – Marek Mikula
“We highly recommend Machinery Movers s.r.o. They managed to relocate our entire production hall within a week. This involved several machines weighing between 3 and 70 tons. Their approach was accommodating and professional.” – Luboš Barta
Blog
- How much does it cost to move a CNC machine or a production line?The cost of moving a CNC machine ranges from approximately 20,000 CZK for a simple move within a factory to 400,000 CZK or more for more complex jobs involving …
Číst celéHow much does it cost to move a CNC machine or a production line?
- Machine Relocation: What to Expect from Your Initial Inquiry Through to CommissioningMoving industrial machinery often takes longer or costs more than a company expects. This isn’t because the transport itself is complicated, but because the work before and after it …
Číst celéMachine Relocation: What to Expect from Your Initial Inquiry Through to Commissioning
- The Most Common Mistakes When Moving Machinery and What Each One Actually Costs YouThe greatest risk involved in moving an industrial machine usually doesn’t arise during the actual handling. It arises weeks earlier, during the preparation phase, which is either rushed or …
Číst celéThe Most Common Mistakes When Moving Machinery and What Each One Actually Costs You
- Relocating a press weighing over 100 tons: how the process works and what can stop itMoving a press weighing over 100 tons is not a simple one-time relocation of a machine. In practice, it is a technical relocation—that is, the entire process of moving …
Číst celéRelocating a press weighing over 100 tons: how the process works and what can stop it
- Relocation of a production line without interrupting productionIt is possible to relocate a production line without halting production, but only in certain situations and with a well-planned approach. In most cases, operations will be at least …
Číst celéRelocation of a production line without interrupting production
- How to shorten Production Downtime When Relocating a MachineProduction downtime during a machine relocation isn’t caused solely by the move itself. Most time is often lost once the machine is already in its new location but cannot …