For over ten years, we have helped companies manage industrial machinery moving safely, carefully and with minimal disruption. At Machinery Movers, we handle CNC machine moving, heavy machinery transport, and the relocation of technologies, production equipment and entire production units across the Czech Republic and abroad. Every move is planned individually with regard to the type of equipment, the available space, access conditions and the operational requirements of the site. We provide handling, loading, transport, unloading and positioning at the new location so the whole project is completed safely and with as little downtime as possible.
No machinery move is ever the same. Before anything is moved, we come to inspect the machine itself, the access routes, the surrounding space and the parts of the operation that must remain running. A CNC machine has different requirements from a press shop, and moving a single machine is not comparable to relocating an entire production line. Weight, dimensions, route limitations and the level of downtime the client can afford all play a role. That is why we do not work from a template. We propose the solution only after an on-site assessment, so it makes sense technically, safely and in terms of timing.
Jan Holub, Managing Directors
Reference projects
How Machine Relocation Works
First, we need to know what we’re dealing with—the type of machine, its dimensions, weight, and the pickup and delivery locations. Based on this information, we’ll propose a handling method, the necessary equipment, and a timeline. Then comes the preparation: disassembly, securing, routing through the hall or outside, loading, and transport. As needed, we coordinate a crane, forklift, or other equipment. On site, we position and set up the machine and hand it over ready for further work. We manage the entire process so that production downtime is kept to a minimum.
What We Move Most Often
- CNC machining centers, lathes, milling machines, injection molding machines
- Presses, furnaces, process equipment
- Handling and transport of heavy machinery (including oversized items)
- Machine relocations within the hall (layout changes)
- Turnkey relocation of production lines and workstations
- Dismantling, loading, transport, installation, and alignment
- Route planning, coordination of cranes/forklifts, safety
Send us the machine specifications (type, dimensions/weight, origin–destination, deadline), and we’ll provide a proposal and quote within 24 hours.
Machinery relocation with Machinery Movers. Anytime, anywhere.
The price and process always depend on the specific project. The more details you provide us with at the outset, the faster we can provide you with a concrete proposal. We will prepare a non-binding quote within 24 hours and propose the safest approach (including dismantling, installation, and insurance) for both the Czech Republic and international projects.

What Our Customers Say
“We worked with Machinery Movers to move CNC machines from France to the Czech Republic in August–September 2024 and March 2025. This involved a total of 8 CNC machines and 2 storage racks. I greatly appreciate their professionalism, problem-solving skills, and flexibility. I recommend Machinery Movers and look forward to further collaboration.” – Marek Mikula
“We highly recommend Machinery Movers s.r.o. They managed to relocate our entire production hall within a week. This involved several machines weighing between 3 and 70 tons. Their approach was accommodating and professional.” – Luboš Barta
Blog
- How to Minimize Production Shutdown During Machine RelocationProduction downtime during machine relocation doesn’t have to last for days. With well-prepared projects, it’s often reduced to just a few hours. It’s not just the actual handling of …
Číst celéHow to Minimize Production Shutdown During Machine Relocation
- What Can Go Wrong When Moving a Machine: Real-Life ScenariosMoving a machine is not just about the physical handling. The biggest problems often arise even before the equipment arrives or right when it’s time to get it up …
Číst celéWhat Can Go Wrong When Moving a Machine: Real-Life Scenarios
- Moving Machinery on Your Own: When You Can Do It Yourself and When to Call a Professional CompanyCompanies routinely move smaller machines on their own. However, when it comes to heavier, precision, or complex equipment, even a relocation that seems straightforward at first glance can result …
- Safety When Moving Machinery: What Needs to Be Clear Before the Machine MovesSafety when moving heavy machinery isn’t determined solely by the equipment’s load capacity. Preparation, a clear division of responsibilities, and a procedure that remains consistent throughout the move—regardless of …
Číst celéSafety When Moving Machinery: What Needs to Be Clear Before the Machine Moves
- Moving a CNC Machine: What Can Go Wrong If You Underestimate ItWhen moving a CNC machine, problems often do not arise during loading or transport. They only become apparent later, during the first machining operation after setup. The machine fails …
Číst celéMoving a CNC Machine: What Can Go Wrong If You Underestimate It
- How to Prepare Your Business for a Move: A Practical ChecklistThe biggest delays in moving industrial machinery often don’t occur during the actual process, but before it begins. All it takes is a missing manual, unlabeled cables, no one …
Číst celéHow to Prepare Your Business for a Move: A Practical Checklist



